05 September 2016

To ensure maximum life, scaffold boards must be checked regularly. It should be noted that cross cutting a graded board to a shorter length does not affect the structural integrity or grade of the board and as a result, it will still comply with BS 2482:2009; if the board has been either visually or machine graded it will have been graded along the full length. Any defects (unless outlined below) will still remain within the allowance.

Here is a checklist for ensuring your scaffold boards remain free from defects and in the best possible condition for use on your site:

  • If a board shows signs of being accidentally dropped or otherwise abused (e.g. run over) it should be discarded
  • Any board with signs of rot or decay should be discarded
  • End bands should be checked to ensure they are still secure, and fixed or replaced if necessary
  • Boards should be stored in the dry and should have any concrete spillage carefully removed
  • All nails, screws, e.g. Hilti nails should be removed and the board checked for damage.
  • Splits should be checked. Any split must not be deeper than 12mm in thickness. If a split is deeper than this, it should be no more than 225mm long. Splits of less than 225mm may then be repaired using nail plates. Boards with splits longer than this should be cut down. Splits running across the face are not permitted and the board should be cut down to remove any damage
  • Any cut should be ‘superficial’, which means no deeper than 2mm
  • Any board that has been notched should be cut down to remove the notch
  • Any boards stored for a period of time should be regularly checked for signs of decay, particularly watching out for fungus and wet rot. Ideally, stored boards should have access to a regular clean airflow. Boards should not be left ‘close piled’ for more than 3 months. If the anticipated storage is for longer, then the boards should be stored with ‘sticks’ in-between every layer to allow air circulation

Marley Eternit is one of the UK’s principal manufacturers of scaffold boards. Our Scaffold Boards are recognised as the premier scaffold board available and are Kitemarked with the symbol of BSI third party accreditation. Kitemark Licence Number KM 07800 is stamped onto the end band of each board. The Kitemark is a registered certification mark owned and operated by BSI. It is one of the most recognised symbols of quality and safety and offers true value to consumers, businesses and procurement practices.

Posted in


Here at Marley Eternit, we are always on hand to offer practical and experienced support. Whether you have a query, are unable to find what you are looking for or would like to report an issue, drop your details below and we will be in touch.
Please note: we are unable to accept sample requests through this form.